Maryknoll Fathers & Brothers — Price Building, Ossining, New York — Institutional Offices
Nearly complete — completion scheduled November 24, 2026
The Situation
The second-floor offices of the Price Building are served by three 14-ton Daikin VRV EMERION heat pumps and six 8-ton ducted air handlers, installed in 2023–24 and tied into the campus building management system (BMS). For two and a half years staff dealt with offices that were freezing next to offices that were warm, space heaters running with the air conditioning on, and constant high-pitched whistling. They had been told nothing could be done.
What We Found
Mountain Mechanical showed that the Daikin equipment was working properly. The problem was in the controls:
- Relief-damper actuators on all three systems set to reverse-acting instead of direct-acting, so they could not modulate
- Control-loop tuning values set to zero
- An external BMS override forcing a dump damper closed, and another damper manually locked open
- A BMS that had never been fully commissioned with the Daikin controls, with heating and cooling running at the same time
The Solution
In a joint visit with Daikin Applied’s controls team, Mountain Mechanical cleared the override, and the damper began modulating on the spot. The permanent fix separates the three VRV systems from the campus BMS and gives them simple, reliable local control:
- Three Daikin HERO Simple Edge devices, one per outdoor unit, for remote monitoring
- Three Honeywell TR120 wall modules for local seasonal control
- Controllers reprogrammed alongside a Daikin technician, with equipment pre-programmed in Daikin’s lab to keep time on site to a minimum
- Owner training and turnover documents
Status
Mountain Mechanical engineered the controls design and negotiated the contract with Maryknoll, and the installation is nearly finished. Completion is scheduled for November 24, 2026.
Project Details
- Owner: Maryknoll Fathers & Brothers
- Location: Ossining, NY
- Building: Price Building, 2nd-floor offices
- Systems: 3 Daikin VRV EMERION (RXYQ168AATJA), 6 FXMQ96 ducted air handlers
- Service: Controls diagnosis, BMS separation, HERO monitoring
- Timeline: July – November 2026


Have a VRF system other contractors can’t fix?
Mountain Mechanical diagnoses and repairs Daikin, Mitsubishi, LG, Samsung and Fujitsu VRF systems across NYC, Long Island and Westchester. See how our VRF repair and rescue service works, or call 833-504-4822.

