Coney Island Avenue, Midwood, Brooklyn — Commercial Office
The Situation
This office building runs on LG Multi V 5 heat-recovery VRF: LG outdoor units, LG heat-recovery boxes and 38 LG indoor units. A factory visit in May 2025 left the second floor with no air conditioning after repeated LG compressor failures. The slave compressor was shorted and the LG main board was dead.
What We Found
The refrigerant lines dropping to the lower indoor units had no oil traps, so oil was not returning to the compressors. We also found heat-recovery box settings that were wrong, crossed lines between branch boxes, and badly spliced communication wiring.
What We Did
As the LG warranty contractor of record, we replaced the compressor and main board under LG warranty, rebuilt the piping with oil traps, reset the LG heat-recovery boxes, ran new communication cable to all 38 indoor units, then pressure-tested and weighed in the charge. The work was done at night in occupied offices, and an LG Hyper Heat unit was added as a dedicated backup for the IT room.
Results
The system was back in normal operation on March 6, 2026, and the LG distributor confirmed the repairs were appropriate.
Project Details
- Location: Coney Island Avenue, Midwood, Brooklyn
- Building: Commercial office
- Equipment: LG Multi V 5 heat recovery: LG outdoor units, LG HR boxes, 38 LG indoor units; LG Hyper Heat backup
- Service: LG VRF rescue, LG warranty repair, piping correction
- Timeline: August 2025 – March 2026